Interestingly, according to
Diary of a RollerCoaster Girl, Speed at Oakwood is midway through being repainted. The supports are being repainted black, with the track seemingly remaining orange, and the second phase of the repaint will be completed for the 2024 season:
The new paint job looks snazzy! I’m glad to see that things really seem to be looking up for Oakwood, what with Megafobia’s retrack, Speed being repainted, and some kind of alleged new ride investment on the way!
On a side note, Drenched is also closed for the remainder of the season due to some kind of restraint issue according to Oakwood’s website.